Image
    • home
    • About
    • Courses
      • API Courses
      • ASME Courses
      • Technical Courses
    • Integrity Matters
    • Contact Us
  • Home
  • About
  • Courses
    • API Courses
    • ASME Courses
    • Technical Courses
  • Integrity Matters
  • Contact Us

Branch Connections: ASME B31.3 Para. 304.3.2

Training | Jul 2, 2021
branch connection

Calculating Branch Connections: ASME B31.3 Para. 304.3.2 – Whenever a branch is added to the main pipe run (header) an opening is created by the removal of a predetermined amount of metal. We use Branch Connections: ASME B31.3 Para. 304.3.2  to consider the design. The header pipe is weakened as the metal removed is no longer there to resist the …

Read More
API 510API 510 body of knowledgeAPI 510 course ukapi 510 effectivity sheet 2020API 510 exam questionsAPI 510 free course materialAPI 510 training UKAPI 570API 570 Body of Knowledgeapi 570 course ukapi 570 effectivity sheetAPI 570 exam questionsapi 571 effectivity sheetapi 579 training courseapi 580 effectivity sheetapi 580 trainingapi 581 trainingasme b31.3asme level 2 jobsASME PCC 2asme pcc 2 training courseasme plant elearningasme plant inspector jobsASME Plant Inspector Level 1ASME Plant Inspector Level 2asme viiiassessing corroded pipingbest api training providerBody of knowledge 2020Fitness for service traininghow to repair pipinginspection coursesinspection courses UKlearn fitness for servicematthews engineering trainingrisk based inspection trainingwilkinson couttts api training
Image

Bluesky Building, Arnhall Business Park
Westhill, Aberdeenshire
United Kingdom
AB32 6FJ

General Enquiries Phone: + 44 (0) 333 444 0060
info@wilkinsoncoutts.com

© 2024 by Wilkinson Coutts Engineering Training Ltd.
Terms & Conditions
Privacy Policy